What this plant asks of its ERP link

Ten numbers in this MES used to be literals in the source: how many times a confirmation is offered before somebody has to look at it, how long to wait between attempts, which statuses the ERP puts an order in while it is waiting to be made, how long to wait on one request, and when a number the ERP hands back counts as the number that was sent. Each one was a judgment somebody made once against one ERP, and several of them had a comment beside them arguing for the number rather than stating it.

They are this plant's now. They are seeded from [erp] in the plant pack, owned by the plant's database from then on, and — for nine of the ten — edited on Orders › Configuration by somebody holding erp.define, with the value the plant is actually running on beside each one. They follow the same rule every setting in this product follows:

The literal that was in the source is the shipped default, unchanged. A plant that writes none of these keys behaves exactly as it did.

The keys

Key Ships What it decides
max_attempts 8 How many times one confirmation is offered before it is dead and a person decides
base_backoff_s 5 The wait before the second attempt, in seconds. It doubles after each failure
max_backoff_s 3600 The longest this plant waits between two attempts. The doubling stops here
open_statuses ["Not Started", "In Process"] Which statuses this plant's ERP puts an order in while it is waiting to be made
float_rel_tol 0.001 How far a number the ERP hands back may differ, as a fraction, and still be the same number
float_abs_tol 0.01 The same agreement as an absolute amount, for numbers near zero
http_timeout 30.0 How long the ERPNext connector waits on one request, in seconds
rest_timeout 10.0 The same, for the plain REST connector
default_order_priority 50 The priority an order arriving with none inherits. Lower is more urgent
confirmation_seconds_tolerance 1.0 How far machine_seconds may differ from the time the step was open before fsmes erp validate calls the document wrong
[erp]
mode = "erpnext"
# A plant whose ERPNext bench is across a VPN, takes a maintenance window on
# Sunday mornings, and has added a status of its own.
max_attempts = 24
max_backoff_s = 21600
http_timeout = 120.0
open_statuses = ["Not Started", "In Process", "Material Transferred"]

fsmes pack check reads every one of them offline, and the Configuration page refuses the same values in the same sentences. It refuses a value that would leave the thing it decides unable to decide anything — a confirmation offered no times at all, an empty list of open statuses, a timeout of nothing — and it refuses nothing else. A plant that gives up after three attempts because somebody watches the outbox is answering its own question.

Two lists that are one judgment

base_backoff_s and max_backoff_s are one judgment written as two numbers: a first wait longer than the ceiling on a wait makes every attempt the same distance apart, which is a retry loop with extra words. Either half is refused when it crosses the other, so raise the ceiling before you raise the first wait.

What stays the product's, and why

The test is decision 0035's: ask what breaks if two plants answer differently.

  • The confirmation contract — its field names, its shapes, and the published JSON Schema an ERP team checks files against. A plant that changed one of those would send a document meaning something nobody else means by it.
  • What the MES does with a refusal. An ERP that reads a message and says no is dead at once rather than retried, whatever max_attempts says, because retrying sends the identical message and gets the identical answer.
  • The words in open_statuses. The list is the plant's; the vocabulary is the ERP's. This MES holds no list of what ERPNext, SAP or Odoo may call a status and does not judge the words — only that each one is a word, that the list says something, and that none of them has a comma in it, because the list travels to the product as a comma-separated setting.

The one that is not edited on the page

confirmation_seconds_tolerance is a pack key and a setting, and it is not a box you type in. It is read by fsmes erp validate, which reads a folder of files and nothing else — no ERP, no connector, no database. That is the whole point of that command: a plant's ERP team runs it on a shadow-mode outbox, often on a laptop that has never had an MES database on it. There is no session to read a live row through, so a box on the page saying in force the moment you save it would have been false. Its row on Orders › Configuration says what is true instead: it changes when the pack is applied and the plant restarts.

Two retry policies, not one

[uns] has three numbers with these same three names and these same three values, and they are deliberately separate settings. The namespace broker on this site and an ERP across a VPN are two systems with two outages: a plant that widened its ERP retries because the ERP takes a four-hour maintenance window on Sundays did not mean to widen how long it holds namespace messages.

Editing them

Orders › Configuration (/dashboard/config/supply_chain) lists all six sections with their keys, the value this plant is running on, and whether that value is the product's default or one the plant set.

  1. Open Orders › Configuration. Each row's Set to column holds one box per key, with the key's name beside it.
  2. Type the new value and press Save. There is one Save per row, because the two backoff numbers and the two read-back tolerances are each one judgment written as two numbers.
  3. It is in force without a restart. The three a service applies — max_attempts, the two backoffs — and default_order_priority are in force on the very next message. The four a connector applies — open_statuses, the two tolerances and the two timeouts — reach the running sync worker at the start of its next cycle, which is MES_ERP_POLL_SECONDS later and five seconds by default. Nothing is restarted and no pack is re-applied either way.

You need the erp.define capability, which the built-in Administrator and Agent roles hold. Without it the page shows you every value and no box.

Every change is written to the audit trail — who, when, what it was and what it became. Undo is typing the old number back. There is no revision history and no approval step here, because nothing in this MES records the timeout that was in force when this confirmation failed: the message stores its attempts and its error, not the policy that produced them.

Why a connector is handed its settings rather than reading them

The ERP sync worker keeps every database transaction short and never lets one span an HTTP call, so the ERP being slow cannot hold up the plant floor. An adapter that opened a database session of its own to find out its timeout would be the first thing to break that rule. So the worker reads this plant's policy once per cycle, in a transaction that is closed before anything is sent, and hands it to the connector. A connector published on its own and written against the older port takes no policy at all and keeps the values it was built with, which is exactly what it did before this existed.

What the pack still does, and what it no longer does

fsmes pack apply seeds each key the pack carries, once. After that the database owns it and a later apply leaves it exactly as it is — the same rule every other kind a pack seeds already keeps. So editing plant.toml and re-applying does not move a number this plant has already taken ownership of; fsmes pack status reports the difference. A pack is how a new plant starts, not how a running one is steered.

Where the value lives

A number is read in three layers, in this order:

  1. the row in this plant's plant_settings table — what its administrator or its pack wrote;
  2. the setting the pack compiled into the environment (MES_ERP_*);
  3. the literal this version of the product ships.

confirmation_seconds_tolerance has only the second and third of those, for the reason above.

One change to what the MES sends

An order arriving from the ERP with no priority now says so: the ProductionRequest it is read into carries priority: null rather than 50. Fifty was this MES's own answer written into the border, so an order that had never carried a priority and one that carried exactly fifty arrived as the same document. What an order carrying none inherits is default_order_priority, applied by the MES when the order is imported — so nothing about a plant that leaves that key alone changes, and a plant that dispatches on a 1–9 scale can finally say so.