0026 — Counted work that will not fit inside the run time names the disagreement, not a culprit

  • Status: accepted, amended 2026-09-18 (below)
  • Date: 2026-09-14, amended 2026-09-18
  • Deciders: maintainer
  • Amends: 0025

Amended on 2026-09-18 — the figure is withheld

Everything below still holds about what the MES knows and what it says. What changed four days later is what it prints: where the counted work will not fit inside the run time there is now no performance figure and no OEE, only the sentence and the numbers behind it. The ratio is kept and published, under a name that says what it measures. See the amendment at the end of this record.

Context

0025 took the min(1.0, ...) cap off OEE performance, earlier on 2026-09-14, and it was right to. It also decided what a figure above 1.0 means:

Above 1.0 — the machine ran faster than its rating. Reported as it is, with the note that says what it means: the rating is slower than the machine, a master-data finding, not a score above physics.

Later the same day the lab ran two plants and caught that sentence out. Northgate Machining's Deburr: the MES reported 826 units and 1,878 line-seconds of run time for a machine its own master data rates at 2.4 s a unit — 1,982 seconds of work recorded inside 1,878 seconds of running, so performance read 1.056 and the MES announced the rating was slow.

The script that generated the data rated the machine at the same 2.4 s and fitted its own 831 units inside its own 1,996 running seconds. The rating was right to within a tenth of a percent. What was wrong was the MES's run time, and there is a reason it was: Deburr changes state every 2.7 seconds on average — 1,112 changes in 3,000 seconds, a median running burst of 3 s — and at the replay speed the agent saw the machine about every 6 seconds. It could not resolve the intervals, so it recorded less running than there was.

One further fact came out of reading the code: performance > 1.0 and "the counted work will not fit inside the run time" are the same inequality, cycle × units > runtime. So the note on that branch was never describing a measurement of the master data. It was naming one of at least three causes and calling it the answer.

Options considered

Option For Against
Leave 0025's note as it is No churn on a decision one day old It states a cause the MES cannot know, and the lab has already shown it stating it wrongly. A confident wrong explanation is worse than no explanation
Take the units counted outside run time out of performance The arithmetic reconciles; performance never passes 1.0 again Invents a claim about the plant: the MES knows only where it counted those units, not where they were made. It would also move a real plant's manual confirmations, which carry no observation at all
Report unknown above 1.0 Honest that the figure cannot be trusted Already rejected in 0025, for the same reason: it throws away a real measurement
Name the disagreement and measure the one candidate cause the MES holds evidence for (chosen) Nothing is moved, nothing is capped, and the screen stops asserting a cause; the one measurable candidate becomes a number a plant can act on The note is longer, and a plant reading "one of these is wrong" has to do the next step itself

Decision

A performance figure above 1.0 is reported exactly as 0025 decided — uncapped, with the true number, and the OEE above 1.0 that follows. What changes is the sentence beside it. It states the disagreement and both of its numbers, and says the MES cannot tell which of the two is wrong: the rating may be slower than the machine, or the run time may be short of what the machine really ran.

Beside it the MES reports one measured quantity, counted_outside_run_time — how many units, good and scrap together, it booked at an instant its own state history did not have the machine running. That is a fact about this MES's two records of the same machine, and it is the only one of the three candidate causes the MES holds evidence for. Nothing is moved and nothing is dropped because of it (house rule 1): the units stay in good_qty, in scrap_qty, in quality, and in the performance numerator. They are named, and that is all.

Both series stay on one clock — the instant the MES booked the reading — and that is what makes the new quantity mean anything: a booking and a state interval can be compared because the same clock stamped them. See what was tried and rejected, below, for why they are not on the OPC server's clock.

What was tried and rejected: the server's own clock

The obvious next move was to stamp both series with the server's SourceTimestamp instead: the agent already reads it for tag history, and a batch of readings is a queue, so booking them all at the instant the batch reached the database looks like exactly the kind of smearing that would cost run time. It was built, and then measured against the same two-plant plan on the same machine within the hour, public/main against the branch:

station availability before after the line's own
Deburr 0.617 0.758 0.606
Saw 0.714 0.809 0.708
Mill 0.872 0.877 0.858
all six bottling stations — within 0.005 of before —

It made the two numbers it was meant to fix worse, and the reason is worth keeping. The subscription holds one value per item per publish, so what arrives is a sample, and its SourceTimestamp says when the value last changed — which for a machine flipping faster than the publish interval is an instant well before the sample was taken. Closing the previous interval there hands every flip nobody saw to whichever state the sample found, and the staleness is proportional to the state's own duration: the long state is stretched, the short one is squeezed. Deburr runs 3 s and starves 1 s, so running grew. Booking at the flush instant splits the unobserved flips at the sample boundaries instead, which on this data is much closer to unbiased — not because it is right, but because its error does not lean.

So the MES keeps one clock, and the honest statement about run time under a coarse subscription stays what it is: an estimate whose resolution is the publish interval.

One thing that experiment did settle, and it matters for reading counted_outside_run_time: on the server's clock the quantity nearly vanished — Deburr went from 163 units to 102, Saw from 105 to 12, the six bottling stations from 33–126 to 0–4. So a large part of what it counts is the agent's own batch putting its state changes ahead of its counts, not the plant. That is not a reason to suppress it. It is the number saying my two records of this machine do not line up, which is exactly the question a reader who sees performance over 100 % needs answered, and it points at the right place: what the MES saw, not what somebody typed.

Consequences

Easier. A plant that sees performance over 100 % is told what the MES actually observed rather than what it guessed, and the one candidate it can check — production booked while the machine was not running — is a number on the same screen rather than a query somebody has to think of.

Harder. The note is a sentence and a half rather than a phrase. The row on the analysis screen reads counted work outruns the run time rather than rating slower than the machine; a plant that had learned the old wording has to learn the new one, which is the price of it having been wrong.

To revisit. The residual on Deburr is a sampling limit, not a bug: no timestamp fixes intervals nobody observed, as the rejected option above measured. If a plant needs run time finer than its subscription, that is a conversation about publish intervals and deadbands at the machine, and it should produce its own decision record rather than a correction factor in here. What the MES could do, and does not yet, is say what its run-time resolution is — the publish interval it subscribed at — beside the number, so a reader can tell a real 3 % from quantisation. That is the next thing to write down.

House rules touched

  • 1 — never invent production. counted_outside_run_time names units; it never moves or drops them.
  • 2 — unknown is a valid answer; zero is not. Extended once more: which of my two numbers is wrong is also allowed to be unknown, said out loud, rather than guessed.
  • 6 — charts get checked by looking at them. The row was re-rendered and looked at after the wording changed, and the test that pins it now also pins that the old accusation is gone. The rejected option above was measured the same way, which is the only reason it is in this file rather than in the product.

The amendment, 2026-09-18: the ratio is published, the figure is not

What happened

A bottling plant stood up overnight in the lab, replaying a recorded line at ten times real time. In the morning its dashboard showed OEE 980 % and performance 881 %, and one machine's page showed OEE around 800 %. The maintainer's reading of it was one line: "why are oee and performance numbers at 980% and 881%? that's clearly an error."

He was right, and there were two errors under it.

The clock. A replayed plant counts at the line's pace and measures every duration on the wall's. Performance is the one OEE factor that divides a count by a duration, so at 10x it comes out ten times too big — availability and quality are ratios of things measured the same way and were unaffected. The MES is told the replay speed (MES_SIM_SPEED, which fsmes fleet start --speed puts into the environment of every process of that plant, the API included) and now restates the run time on the line's clock before dividing, and says everywhere that it did: a Replay 10× bar on every screen, replay on /health, mes_replay_factor in /metrics, a pill on the fleet console, clock beside the figures. A plant meant to be looked at runs at 1×; above 1× it is a test harness and the screens say so.

The figure. The rest of it is this record's own subject. performance > 1.0 is the same inequality as the counted work will not fit inside the run time, and this record already said the MES cannot tell which of its two numbers is wrong. It printed the ratio between them anyway, as a percentage, on every surface except the analysis waterfall — where #62 had put the sentence and nowhere else. A percentage on a screen is read as a measurement of the machine. That one measures the gap between two of the MES's own records.

What changes

Where cycle × units > runtime (run time on the line's clock):

  • performance is None, and so is the oee built on it. The same unknown the product already uses for a number it will not state — house rule 2, and the same shape as a figure withheld below a pack's coverage floor.
  • The sentence is printed on every surface the figure used to reach, not only on the analysis screen and not only in a tooltip: the dashboard tile and machine card, the machine page, /analysis/oee, /kpis/oee/{code}. It still names the disagreement, both its numbers and none of the three culprits.
  • The ratio is kept, as performance_ratio, with counts_outrun_run_time beside it. Nothing measured is discarded — that was 0025's objection to reporting unknown, and it stands. What the ratio loses is the name performance, which is the claim it could not support.
  • Nothing is capped. A station reading exactly 1.0 still means a station that made exactly what its rating allows. Capping at 100 % would be the same lie pointing the other way, and 0025 settled that.
  • /metrics exports no performance and no OEE series, and now says so in writing: a scrape is read without the sentence beside it by definition.

Why this is not the option 0025 rejected

0025 rejected "report unknown above 1.0" because it throws away a real measurement. This does not throw it away: the ratio, both its inputs, the units counted outside run time and the run time itself are all in the payload and all on the screen. The figure is not a measurement being suppressed; it is a name being corrected. A plant that wants the ratio has it, under a name that tells it what it has.

What it costs

A plant that had learned to read performance over 100 % as "look at the rating" now reads a dash and a sentence, and has to read the sentence. That is the price of the number having been unreadable without it — and of one reader, on one morning, reading 980 % and having to ask whether his plant or his MES was broken.